- Home
- Bathroom Installation
Bathroom Installation & Bathroom Fitters in Abbey Wood
New bathrooms, en-suites and cloakrooms plumbed and fitted, from a suite swap to a full refit.

What's included
- Full bathroom and en-suite refits
- Baths, basins, toilets and showers fitted
- Pipework moved and concealed
- Old suites removed and disposed of
Bathroom Installation for homes and businesses in Abbey Wood
No room packs in as much plumbing per square metre as a bathroom. Once the tiles go on, the bulk of it disappears from view. Before boxing anything in, we work out each pipe run, the fall of every waste and how valves will be reached. The room should then work in year ten just as on day one.
What drives the price
Four things set the price: do fittings keep their positions, how good is the suite, how much tiling is there, and will floor or walls want repairing after the strip-out? Of every possible change, relocating the toilet involves the most work. Its waste pipe is large and has to fall correctly. Your written quote shows materials and labour as separate figures.
Who does which part
Decide early who does what, and tell us before work starts. Under Part P, electrical items such as an electric shower, a shaver point or an extractor fan need a qualified electrician. Next, we can arrange plastering and tiling, or your own tradespeople can take them on. For a shower alone, see our page on fitting a shower.
Step one: a plan on paper
Every sound bathroom begins as a drawing. First, take the room's measurements, then sketch in the window, the door, the soil pipe and whatever is boxed. Then place the toilet; its waste pipe is so large that most layouts are built outwards from it.
After that, place the shower and bath, whose wastes must fall enough to drain, which limits their distance from the stack. Now leave standing room at the toilet and basin, and room for a shower door to swing. Finally, settle storage, a place for towels and a mirror you can see yourself in. Draw it all to scale, which stops costly changes of mind midway through the job.
The sequence of a refit
Every refit follows one order. First, we strip out the flooring, the tiles and the old suite, until only sound walls and a sound floor remain. Next comes first fix: we alter the pipes for the new positions, and any cabling goes in too. Then we prepare the walls and waterproof the wet areas.
After that, we fit the shower tray or bath and test it. Flooring and tiling come next. Then, at second fix, we connect the basin, the toilet, the taps, the shower and the accessories. To finish, we seal everything, test for leaks and clean up. Knowing these stages explains why you lose the room for as long as you do.
Bath, enclosure or wet room
Start with the largest question: how do you want to wash? First, a bath that has a shower above it, which takes little space and suits a family. Second, an enclosure apart from the bath, which gives a better shower. Third, a wet room or walk-in area; nobody steps over a tray, so it suits people whose mobility is limited.
It relies on thorough waterproofing, known as tanking, and a floor that slopes to the drain. Next, your hot water system decides which showers are open to you; see our shower fitting page. Whichever you choose, good extraction clears the steam and keeps mould away.
The plumbing behind the tiles
What sits behind the tiles decides how good the bathroom is. First, we clip the supply pipes properly, which stops them knocking, and give each fitting its own isolating valve. Next, the wastes must have the right diameter and fall, with a way in to every trap. Then, a hidden cistern or shower valve must stay reachable for servicing.
After that, any pipe to be buried in a wall is protected and tested under pressure, and only then covered. Flexible connectors are handy, yet good practice uses as few as possible. Finally, corroded steel or lead in the old pipework is best sorted out now, with the room stripped; see repairing pipework.
Keeping the room warm and dry
A dry, warm bathroom is nicer to use and has a longer life. A towel rail can be heated off the central heating, electricity, or the two combined, and the combined kind still works in summer. Next, underfloor heating beneath the tiles takes the chill away and dries the floor faster.
If a radiator is being changed, we size the new one to suit the room; see replacing a radiator. Then, where no window opens, Building Regulations require an extractor fan, and one makes sense even with such a window. Choose one with a humidity sensor or a timer, so it runs until the damp air has cleared.
En-suites, cloakrooms and other tight spaces
In a small room, each choice has to earn its place. A corner basin, a short-projection toilet, wall-hung units and a shower door that slides or folds each save centimetres that count. Next, an enclosure on a slim tray needs less space than a bath. Then, big tiles and an uncluttered floor help a small room seem larger.
After that, a cloakroom below the stairs, or an en-suite, a long way from the soil stack might need its waste pumped. Where a room never had a basin or toilet, Building Regulations on ventilation and drainage may apply. Ask us what will work before you order a suite. For single fittings, see fitting a new toilet.
Getting a bathroom quote in Abbey Wood
To quote, we either visit or work from clear photographs and measurements. Next, what do you intend to change? Are the tiles and suite already picked, or do you want ideas from us? Should we run the plastering, electrics and tiling as well, or just do the plumbing?
Our written quote puts every stage on its own line, so you can compare quotes fairly. Housing in Abbey Wood runs from small flats up to big family homes. Fitting an identical suite can mean far more work in one than in another. Last, before anything is started, we fix a start date and give an honest estimate of the duration.
A larger bathroom may need a bigger hot water cylinder, and a room below the drain level may need a Saniflo or macerator unit.
Bathroom Installation: common questions
How long does a bathroom refit take?
A straightforward suite replacement takes two to three days. A full refit with tiling usually takes one to two weeks.
Will we be without a toilet?
Where it is the only toilet, the work is sequenced so it is out of use for as short a time as possible, usually within a working day.
What should I do while I wait for the plumber?
Turn the water off at the stopcock, usually under the kitchen sink, and open the cold taps to drain the pipes. If water is near electrics, switch off at the consumer unit and keep clear.
Related
More plumbing services in Abbey Wood
Need a plumber in Abbey Wood?
Call now for advice, a price or an emergency visit.



